Additional information was added to d10, h3, h4 and h6.H4: the lot was manufactured from august 21, 2019 - august 22, 2019.H10: the actual sample was received for evaluation.Unaided visual inspection was performed which observed a tear in the middle front side of the bag and abrasion on the back side of the bag in the same area.A functional testing was performed with water which revealed a leak only from the front side of the bag.Additional magnified inspection verified a tear/hole in front side of the bag where the leak occurred.The reported condition was verified.The cause of the condition could not be determined.A batch review was conducted and there were no deviations found related to this reported condition during the manufacture of this lot.Should additional relevant information become available, a supplemental report will be submitted.
|