Additional information was added to h3, h4 and h6.H4: the lot was manufactured from january 28, 2020 - january 29, 2020.H10: the actual device was not available; however, a photograph of a sample was provided for evaluation.Visual inspection was performed to the provided photograph which revealed a leak from the spike port bonding area.The reported condition was verified.The cause of the condition was not determined; however, most likely was due to inadequate or lack of cyclohexanone applied to the spike port cap tube when it was inserted to the spike port during the manufacturing process causing an incorrect bonding.No other sample was provided and therefore, it could not be evaluated.A batch review was conducted and there were no deviations found related to this reported condition during the manufacture of this lot.Should additional relevant information become available, a supplemental report will be submitted.
|