The production device history record (dhr) for this intra-aortic balloon pump (iabp) was not required to be reviewed per the company standard operating procedure since the device manufacture date is greater than one year from the event date.The getinge stm found that the connector was broken where it meets the top of the console connector.The stm replaced both the coiled cable and the internal cable.The stm then completed full preventive maintenance.All calibrations, checks and checklists were completed and passed.The iabp was then returned to service.The initial reporter named is a getinge employee who has different contact details from that of the event site, and has the following contact information: (b)(6).
|