Additional information was added : the device was manufactured between june 21, 2018 - june 22, 2018.The actual sample was received for evaluation.A visual inspection was performed which observed that the primary packaging was found opened on the right side only.Sufficient sealing appeared to have been observed on the opened seam section of the primary packaging.Top and bottom seals were not opened and no defect was observed of the valve set.The reported problem was verified.The cause of the reported condition could not be determined.A batch review was conducted and there were no deviations found related to this reported condition during the manufacture of this lot.Should additional relevant information become available, a supplemental report will be submitted.
|