Correction to the previously submitted g4: date received by mfr.G4: the correct baxter aware date is 12/07/2020, previously submitted as 11/10/2020.H4: the lot was manufactured between july16, 2020 - july 17,2020.H10: two actual devices were received for evaluation.Visual inspection was performed and the spike was found detached from the damaged tube set tubing of both samples.Functional testing was not performed.The reported condition was verified for both samples.The cause of the condition was not determined, however the most likely cause was due to inadequate or lack of loctite 4601 adhesive being applied during the manufacturing process.A batch review was conducted and there were no deviations found related to this reported condition during the manufacture of this lot.The remaining device was not received for evaluation; therefore, a device analysis could not be completed.Should additional relevant information become available, a supplemental report will be submitted.
|