B5: during follow up, it was clarified that thirty (30) cassettes were damaged.H10: the actual device was not available; however, three (3) photographs of the samples were provided for evaluation.Visual inspection was performed and a surface mark was observed on the last fill line tubing located at the port of the cassette.This surface mark was caused by the grippers during the automation assembly and not considered a defect.The reported condition was not verified.A batch review was conducted and there were no deviations found related to this reported condition during the manufacture of this lot.Should additional relevant information become available, a supplemental report will be submitted.
|