A getinge field service engineer (fse) evaluated the iabp unit and was able to confirmed the reported issue of blood back.The fse found traces of blood in the pneumatic module assembly (pim) module, and replaced the pim.The pim cable to backplane was also replaced but as a precautionary measure.The fse then reassembled the iabp and performed a full preventive maintenance (pm) with all calibration, functional and safety checks to meet factory specifications.Unit passed all calibration, functional and safety test per factory specifications.The iabp was then released to the customer and cleared for clinical service.This report is being submitted as the result of a retrospective review conducted in capa 584165.
|