A getinge field service engineer (fse) evaluted the unit.Upon inspection fse found that both batteries were completely drained.Hospital cart was plugged into ac power and ac indicator led was illuminated, however, led that indicates batteries are charging was not illuminated.Fse removed the pump console from the cart, and inserted properly in the hospital cart.Batteries charging led indicator was now illuminated as intended.Fse confirmed both batteries began to charge.Once batteries had enough time to charge fse verified that the iabp turns on when on battery power.Fse performed a pm, full calibration, and tested the unit.The product passed all functional/safety testing.Returned the unit to the customer.
|