G1: device manufacturer address 1: 600 mts.Oeste de entrada, principal ave.Las americas, parque industrial.The actual device was received for evaluation.A visual inspection was performed, and it was noted that the tubing was separated from the second y-site clearlink in the upstream part.A lack of solvent (the solvent was not applied uniformly in the tubing) was also observed during the examination of the tubing.As there were marks of solvent, there could have been a low insertion of the tubing into the y-site clearlink.Dimensional testing was performed at the clearlink y-site housing and tubing and were according to specification.The reported condition was verified.The cause of the condition was determined to be related to the manufacturing process.A batch review was conducted and there were no deviations found related to this reported condition during the manufacture of this lot.Should additional relevant information become available, a supplemental report will be submitted.
|