H10: the device was received for evaluation.A visual inspection was performed, and a leak from the bonding area of the administration spike port 2 was observed.Functional testing was performed, and a leak was verified from the bonding area of the administration spike port 2 of the sample.The reported condition was verified.The cause of the reported condition was due to inadequate, or lack of cyclohexanone applied to the spike port cap tube when it was inserted into the spike port during the manufacturing process causing incorrect bonding.A batch review was conducted and there were no deviations found related to this reported condition during the manufacture of this lot.Should additional relevant information become available, a supplemental report will be submitted.
|