(b)(4) is submitting on behalf of the foreign manufacturer, tosoh corporation, per exemption number (b)(4).This report is being submitted due to a retrospective review conducted under capa(b)(4).A field service engineer was dispatched on 4/17/2018.The fse replaced the uptake and purge check valves for the pump and ran precision and results were within precision specifications.The fse worked on the peek tubing from pre-filter to heater coil stressed and replaced it.The fse reported the sample probe worn and gave replacement.The fse ran calibration and controls and customer verified results within range specifications.The most probable cause of the reported event was the purge check valve.
|