H10: as the lot number for the device was provided, a review of the device history records is currently being performed.The return of the sample is pending.The investigation of the reported event is currently underway.H10: d4 (expiry date: 07/2025).H11: section a through f: the information provide by bd represents all the known information at this time.Despite good faith efforts to obtain additional information, the complainant/reporter was unable or unwilling to provide any further patient, product, or procedural details to bd.H3 other text : device pending return.
|
H10: manufacturing review: the lot history records of this lot were reviewed with special attention to the manufacturing and inspection of this product and the product was found to have met the specification prior to shipment.Based on the information available it is not reasonably suggested that a manufacturing process may have caused or contributed to the reported issue.Investigation summary: the stent delivery system was returned for evaluation; the sheath was elongated, and the stent was partially deployed which leads to confirmed results.It was reported that the procedure was performed bareback, pre-dilation was performed, the anatomy was normal, and the device was placed in the straight section of the lumen prior to deployment.Based on the provided information and the evaluation of the returned sample, the investigation is confirmed for sheath elongation and partial deployment.A definite root cause for the reported event could not be determined.Labeling review: in reviewing the relevant labeling, it was found that the instructions for use sufficiently address the potential risks.The instructions for use state: 'if unusual resistance or high deployment force is encountered during stent graft deployment, abort the procedure, remove the delivery system and use an alternative device.' regarding preparation of the device the instructions for use state that "prior to loading the vascular system over a guide wire, both ports must be flushed with sterile saline (.).Flushing these lumens will also facilitate stent graft deployment".Regarding the anatomy of the placement site the instructions for use states: "prior to stent graft deployment (.), ensure that the proximal stent graft end is positioned in a straight section of the lumen to reduce the risk of increased deployment forces and possible failure to deploy".Regarding accessories the instructions for use states: "prepare a stiff 0.035" guidewire per its instructions for use and advance the guidewire under fluoroscopy to the target location.The use of an appropriately sized introducer sheath is recommended".The packaging pictograms indicate an introducer size of 10f and a 0.035" guidewire.H10: d4 (expiry date: 07/2025), g3.H11: h6 (method, result, conclusion).H11: section a through f: the information provide by bd represents all the known information at this time.Despite good faith efforts to obtain additional information, the complainant/reporter was unable or unwilling to provide any further patient, product, or procedural details to bd.H3 other text : see h10.
|