H10: the device was received for evaluation.A visual inspection was performed, and a hole was observed in the tubing.Functional testing included pressure testing and clear passage under water testing, and it was noted that there was a hole in the tubing.Air pressure testing was performed, and no breaking bubbles were observed during the observation period.Dimensional testing was performed, and the tubing was according to speciation.The reported condition was verified.The cause of the condition could not be determined.Should additional relevant information become available, a supplemental report will be submitted.
|