Updated fields: b4, d9, g3, g6, h2, h3, h4, h6, h10.A getinge field service engineer (fse) was dispatched to evaluate the iabp unit and was able to detect autofill failure.Troubleshot on machine and suspected compressor pressure insufficient.Suggest to replace scroll compressor assembly, pressure/vacuum regulators.The fse replaced the scroll compressor assembly, 5k-hr pm kit, drive regulators and observed there were additional error code on log file and suggested to replace new pneumatic interface module (pim) which was defective & caused balloon pump malfunction again, replaced new pneumatic interface module (pim) and all manifold tests, passed.Test ran with balloon few hours unit as normal (no alarm prompted).Equipment operated as normal and unit released as clinical use.
|