Updated fields; b4, d9, g3, g6, h2, h3, h4, h6, h10.A getinge field service engineer (fse) evaluated the cs300 intra-aortic balloon pump (iabp).Fse found that the helium tank valve was closed when the unit was turned on, which displayed a low helium alarm.Turned the helium tank valve open which removed the low helium alarm.Unit is maintained by inhouse biomed staff.Fse did not duplicate or confirm a helium leak during checkout.Unit passed all calibration, functional and safety tests performed.Unit was returned to customer and cleared for clinical use.
|