G4: 06nov2020 b4: (b)(6) 2020 an authorized service personnel(asp) was dispatched to the customer site and it was determined that the power management printed circuit board assembly (pm pcba) needed to be replaced to return the device to working condition.The asp replaced the pm pcba.The device passed performance verification testing.Following the repair, the device was returned to the customer to be placed back into service.Submission of a report does not constitute an admission that medical personnel, user facility, importer, distributor, manufacturer, or product caused or contributed to the event.
|