It was reported to boston scientific corporation that spaceoar was attempted to be implanted during a spaceoar placement procedure performed on (b)(6) 2020.Reportedly, the procedure was done under general anesthesia.According to the complainant, during the procedure, it appeared that one side of the y-connector was clogged because the physician was able to pushed the saline through the other side.A second kit was opened however, the y-connector also clogged and the procedure was cancelled.There were no patient complications reported as a result of this event.The patient received planned radiation therapy.
|