Additional information was added to d10, h3 and h6.H10: the device was received for evaluation.Visual inspection was performed using the naked eye and the tubing was found separated from the second y-site in the upstream part.Additional inspection was performed which observed that the solvent was not uniformly applied in the circumference of the tubing.Dimensional testing was also performed, and it was determined that the components were as according to specification.The reported condition was verified.The cause of the reported condition was due to lack of solvent or an inadequate insertion during assembly of the second y site and the tubing.Should additional relevant information become available, a supplemental report will be submitted.
|