H10: the device was received, for evaluation without the tubing part.Visual inspection was performed using the naked eye, which observed the tubing was separated from the first y-site clearlink component.Additional inspection was performed, which observed a lack of solvent in the clearlink housing.Dimensional testing was performed, at the clearlink housing.And the component was according to specification.The reported condition was verified.The cause of the condition could not be determined, as the tubing was not available for further evaluation.However, the most likely cause, was due to the manufacturing process.Should additional relevant information become available, a supplemental report will be submitted.
|