G4:25mar2021.B4:02apr2021.The customer clarified that the ventilator was being set up for patient use when the ventilator shut down.The ventilator was not yet connected to the patient.Respiratory therapy staff swapped the ventilator out for a different v60 ventilator.There was no patient harm or delay to therapy.The philips field service engineer (fse) evaluated the unit and determined that the power management board needed to be replaced.The fse replaced the power management board and the issue was resolved.The ventilator successfully passed performance verification testing after the repair was completed.Submission of a report does not constitute an admission that medical personnel, user facility, importer, distributor, manufacturer, or product caused or contributed to the event.
|