Updated fields: b4, d9, g3, g6, h2, h3, h4, h6(type of investigation, investigation findings, component codes, investigation conclusions), h10.Additional information poc: (b)(6).It was reported that the cardiosave intra-aortic balloon pump (iabp) internal communication failure.Getinge field service engineer (fse internal communication failure was resolved by installing (mca000000618) grommet edging, sheet thickness 0.044 -, cable tie, 3.9 inch / 99 mm 2 ea, standoff ss 4-40 male to 6-32 , screw,pan head,ss 6-32 x 1/4parts.Complete pm with full calibration, functional testing and safety check to factory specifications.Returned to the customer and cleared for customer use.Complete pm, and safety test.Reference so (b)(4) for measurement details.No patient involvement.
|