(b)(4).Date sent: 1/11/2024 b3: only event year known: 2023 per service manual operational and diagnostic analysis confirmed the continuous activation and the noise issue.The scroll pump was replaced to address the noise issue and the pcb contact board assembly was replaced to address the continuous activation.The repair and testing of the unit was completed per the service manual, bringing the unit back to full functionality.The unit passed all functional tests and is fully operational.The repair and testing of the unit was completed.The device history records were reviewed and certed by external manufacturing that the manufacturing criteria were met prior to the release of the equipment.The certificate records are accessible through external manufacturing.This report is being submitted pursuant to the provisions of 21 cfr, part 803.This report may be based on information which has not been investigated or verified prior to the required reporting date.This report does not reflect a conclusion by ethicon, or its employees that the report constitutes an admission that the product, ethicon, or its employees caused or contributed to the potential event described in this report.If information is obtained that was not available for the initial report, a follow-up report will be filed as appropriate.
|