Date rec¿d by mfr : 31jul2019, date of report : 02aug2019.Repair information was confirmed.Failure investigation was completed.There was no patient involvement.The fse replaced the power management (pm) printed circuit board assembly (pcba) and the battery to address the reported issue.The pm pcba was installed into a test ventilator in attempt to duplicate the reported problem.Further investigation did not confirm any failures with the pm pcba.Submission of a report does not constitute an admission that medical personnel, user facility, importer, distributor, manufacturer, or product caused or contributed to the event.
|