|
Investigation results: visual inspection: no deviations are detected.Measurement of surface of the housing: to verify whether the deformation had an effect on the plane-parallelism of the housing surface, this was measured using a dial gauge.The measured value of -0.014 mm lies within the given tolerance (0 ± 0.02mm).Permeability test: the test showed that the progav is permeable.Computer controlled test: the computer controlled test has shown the opening pressure of the progav, at a reference flow rate of 20 ml/hr in a horizontal position, to be 1.73 cmh2o.This is within the specified tolerance of 0 cmh2o ± 3 cmh2o.Adjustability test: the progav was found to be not adjustable to specifications.Braking force and brake function test: the braking force test indicates that the brake function of the progav is present.Due to the non-adjustability of the valve, as detailed in section.Adjustability test of the braking force was not possible.After dismantling of the valve, clearly deposits were found in progav.Results: based on our investigation, we are not able to substantiate the claim of "under-drainage".We were able to detect during the investigation that the valve was not adjustable.However, we assume that the significant deposits found within the valve may have temporarily caused the functional impairment.Deposits caused by natural substances in the cerebrospinal fluid, such as protein, blood or tissue particles, are among the known and unavoidable risks and side effects of hydrocephalus therapy.We can exclude a defect at the time of release.The valve met all specifications of the final inspection when released from christoph miethke (b)(4).No further regulatory actions are required from our point of view.
|