Additional information was added to d9, h3 and h6.H10: two (2) actual samples were received for evaluation.Visual inspection did not identify any abnormalities that could have contributed to the reported condition.Functional testing was performed including pressure testing and clear passage testing, and the results were satisfactory.Additionally, priming testing was performed, and no defect was observed.Dimensional testing was also performed, and the spike was according to specification.The reported condition was not verified in both samples.Should additional relevant information become available, a supplemental report will be submitted.
|