Updated fields: b4, g4, g7, g8, h2, h4, h6 (type of investigation, investigation findings, investigation conclusions), h10, h11.Corrected field: g1 (contact person ¿ mfg site), h10.A getinge field service engineer (fse) was dispatched to evaluate the iabp.The fse determined that there was leakage from the safety disk.The fse opened the safety disc and cleaned it and the problem was rectified.The fse performed all functional and safety checks to meet factory specifications.Unit passed all functional and safety test per factory specifications.The iabp was then released to the customer and cleared for clinical service.
|