Investigation: visual inspection: during the investigation, scratches on the outer housing of the valves and deposits on the catheter were determined.Furthermore, a deformation of the outer housing of the progav valve could be determined.The measurement of the plane parallelism could confirm that with a value of 0,120 mm - outside tolerance (0 ± 0.02 mm).Permeability test: a permeability test has shown that all components are permeable.Computer controlled test: to investigate the claim of over- drainage, the opening pressure is measured using a miethke computer controlled testing apparatus which simulates a cerebrospinal fluid flow.The valves are tested in both the horizontal as well as the vertical positions.The results show that the valves operate within the accepted tolerance in both positions.Adjustment test: the progav was tested and is adjustable to all specified pressures.Braking force and brake function test: the brake functionality test has shown that the brake function is fully operational and the braking force is within the given tolerances.Internal inspection: after dismantling of the valves, deposits were found in both valves.To make the proteins / deposits in the shunt system more visible, they were colored using a staining solution.Results: based on our investigation results, we can determine deposits as well as a deformation of the outer housing of the progav.Neither the deposits nor the deformation had an effect to the technical properties at the time of the investigation.The cause of the aforementioned functional impairment is not known to us at the time of the examination.Proteins in the cerebrospinal fluid can influence the function temporarily and are known side effects in hydrocephalus therapy.We can exclude a defect at the time of release.The shunt system met all specifications of the final inspection when released from christoph miethke gmbh & co.Kg.No further regulatory actions are required from our point of view.
|