It was reported that a selenia dimension procedure on june 16th, and the c-arm rotation switch did not work during the process.A field engineer examined the equipment and determined that the rotation switch under the c-arm was defective, the c-arm rotates even when the switch is released.The switch was replaced.The system passed all tests and meets the manufacturer´s specifications.No patient or staff injury was reported.No other information is available.