|
One sample was received for evaluation.The ruptured tube is confirmed however this condition did not originate from the manufacturing facility.In order to determine a root cause, a gemba walk was done at the manufacturing facility focusing on the manufacturing equipment and process.In addition, qc inspections are performed to the product for material release that include a visual inspection sampling to verify the correct assembly from device, as well a 100% visual inspection perform by production personnel during the process, in order to detect and discard any identified deficiencies.The product design safety, performance, and effectiveness remain the same or better.No new hazards, hazardous situations, harms, or failure modes are introduced due to this event.Based on the above assessment, no additional updates are being pursued.
|