Sections d1, d2a, d2b, d4, g1, and g4 were updated.The sample was a plasma sample.The calibration was last performed on (b)(6) 2024 and it was acceptable.The field service engineer found an issue with the rinse tubing.He replaced the rinse mechanism tubing, the check valve, and the vacuum vessel and adjusted the rinse levels.Precision studies were performed and they were within specifications.The service actions (replacing the rinse mechanism tubing, the check valve, and the vacuum vessel and adjusting the rinse levels) resolved the issue.No further issues were reported afterward.
|