|
Samples have been received; sample evaluation is pending.A follow-up report will be provided upon conclusion of the investigation.This product incident is documented in the o&m halyard, inc.Complaint database and identified as complaint (b)(4).This information is submitted pursuant to 21cfr803 and should not be considered to be an admission that an o&m halyard, inc.Product is defective or has caused serious injury.
|
|
One (1) sample arrived inside a sealed product package.A device history record (dhr) evaluation was conducted for complaint lot.The reviewed information confirmed that the lot was manufactured in accordance with specification.The certificate of analysis/conformance provided by raw component suppliers were reviewed, raw components were found to meet specification and manufactured according to specifications.The manufacturing site performs incoming inspection of raw materials (fabric and packaging components) upon receipt.Inspection includes evaluation of attributes and dimensions.There was no odor noted at that time.The fabric manufacturing site reviewed the anti-static treatment for the fabric rolls used for this product.All results were within the allowed window for static decay and within nominal/typical readings.The review included the body/sleeve film fabric as well as the side panels for the aero blue surgical gowns.The manufacturing site has established controls which include: 1.Cleaning program: no changes to cleaning chemicals, composition or cleaning frequency have been performed in the past 5 years.As part of the line clearance process, each manufacturing line is required to clean each surface where the gowns make contact twice a day.The cleaning agent used is an approved chemical from corporate product safety group.The process includes the assurance of dry surfaces before product assembly begins.2.General manufacturing entrance rules include: access controls to authorized personnel, protocol to prevent unauthorized liquids (perfumes, deodorants, strong scented lotions, etc), the use of make-up is prohibited by assemblers.3.All personnel must follow guidelines for gowning prior to entering the manufacturing area, this includes hair covering, hand washing, and donning of a lint free long sleeve gown.4.A pest control program is in place at the gown manufacturing facility.Pesticides are used only on the external perimeter of the manufacturing plant and in the administrative offices.Pesticides used are not in contact with product or manufacturing process.The fumigation services are provided bi-weekly.Internal insect traps for flying insects are located on walls at a certain distance from the product/process.5.An interview process was conducted with personnel at manufacturing areas to identify if there have been any reports of strong odor on fabric or other raw material components during production timeframe.There have been none.Actions taken 1.Personnel of the manufacturing lean teams of aero blue surgical gowns were notified of customer complaint received.2.Complaint data will be monitored to identify upward trends associated with the reported incident/family using the track and trend tool.3.A root cause analysis kaizen event will be conducted to try and further analyze the cause of reported smell.This product incident is documented in the o&m halyard, inc.Complaint database and identified as complaint (b)(4).This information is submitted pursuant to 21cfr803 and should not be considered to be an admission that an o&m halyard, inc.Product is defective or has caused serious injury.
|