Additional information: d9, e4, g2 (add source), h3, h6, h10, h11.H11: the actual device was received for evaluation.Visual inspection did not identify any abnormalities that could have contributed to the reported condition.Pressure, clear passage, gravity, and water referee back pressure testing (on the clearlinks) along with priming were performed and no defects were observed.The sample was connected to an in-lab spectrum iq pump and a simulation of the usage process was performed with no defects observed.The reported condition was not verified.A batch review was conducted and there were no deviations found related to this reported condition during the manufacture of this lot.Should additional relevant information become available, a supplemental report will be submitted.
|