|
Updated fields: b4,d9, g3, g6, h2, h3, h4, h6 type of investigation, investigation findings, component codes, investigation conclusions, h11.A getinge field service engineer (fse) was dispatched to evaluate the iabp unit and was able to confirm the reported issues.The fse replaced the ecg input to front end cable assy, ecg trunk cable and ecg lead wire set to resolve the ecg trigger / signal - difficult to obtain / malfunction and the fse solved the reported problem of autofill failure, eliminated leak on the vacuum quick coupling that connects to the pump.Operational tests performed with a positive outcome.The fse completed all safety, functionality, and calibration checks and all tests passed to factory specifications.
|