|
Updated field: b4, (g1(contact office, contact person ¿ mfg site), g3, g6, h2, h3, h6 (type of investigation, investigation findings, component codes, investigation conclusions), h11.A getinge field service engineer (fse) was dispatched to evaluate the unit.The equipment had "system failure at power-on and during operation.The machine was not in use.Offset calibration and cleaning of connector contacts.Probable faulty front-end board to be replaced.The fse replaced the pcb, front end module.Repair completed.Operational tests performed with positive results.
|