|
Updated fields: b4, b5, b6, b7, d9, d10, e1 (initial reporter), g3, g6, h2, h3, h6 (health effect: clinical code, type of investigation, investigation findings,component codes, investigation conclusions, health effect: impact codes), h11.Corrected fields: e1 (event site telephone).A getinge field service engineer (fse) stated that the battery test procedure was indicated.The batteries did not last long enough, so they were replaced as part of preventative maintenance.All functional and safety checks performed to meet factory specifications.
|