Visual inspection: during the investigation, a deformation of the outer housing of the progav could be determined.The measurement of the plane parallelism could confirm that with a value of -0,053 mm - outside tolerance (0 ± 0.02 mm).Permeability test: a permeability test has shown that all components are permeable.Computer controlled test: to investigate the claim of over-drainage, the opening pressure is measured using a miethke computer controlled testing apparatus which simulates a cerebrospinal fluid flow.The valves are tested in both the horizontal as well as the vertical positions.The results show that the valves operate within the permissible tolerance in their respective relevant positions.Adjustment test: the progav was tested and is not adjustable.Braking force and brake function test: the brake functionality test has shown that the brake function operates as expected; however, the breaking force cannot be measured due to the non-adjustability of the valve.Internal inspection: after dismantling of the valves, deposits were found in both valves.Results: based on our investigation results, we can determine that the progav cannot be adjusted.The deformation detected on the valve and the visible deposits inside have led to the functional impairment.Furthermore, we can determine visible deposits in the shuntassistant.The deposits did not affect the technical properties at the time of the investigation.Deposits caused by natural substances found in the body, such as protein, blood, or tissue particles, are among the known and unavoidable risks and side effects of hydrocephalus therapy.Even small amounts of organic deposits can impair the integrity of the valve.The examination of the returned product is complete with the preparation of this report.We can exclude a defect at the time of release.The shunt system met all specifications of the final inspection when released from christoph miethke gmbh & co.Kg.No further regulatory actions are required from our point of view.
|