|
Conclusion not yet available, evaluation in process.A follow-up report will be submitted as soon as the investigation is complete.Oscor inc.Is submitting the above report to comply with 21 cfr part 803, the medical device reporting regulation.The report is based upon information obtained by oscor inc.Which the company may not have been able to investigate or verify prior to the date the report was required by fda.This report does not constitute an admission that the device, oscor inc., or its employees, caused or contributed to the event described in this report.Nor does this report reflect a conclusion by fda, oscor inc., or its employees, that the report constitutes an admission that the device, oscor inc., or its employees caused or contributed to the event described in this report.
|
|
The following sections were updated in follow-up 1.B4, d9, g3, g6, h2, h3, h6 & h11.One 14f occlutech guiding sheath was returned under rma# 1202113184 with the dilator.The loader was not returned.No visible blood was found on or inside the sheath or dilator.The hub was detached from the sheath.According to the event description summary, during the procedure, the physician wanted to insert the odsiii sheath 14f into the femoral vein and discovered that the connection between the valve and the sheath was not tight.The physician was able to pull the valve off the sheath easily.The hub was detached from the sheath upon receipt of the product.Manufacturing procedure (thermoplastic overmolding of parts) make sure to insert the tube until the mark in the core pin without covering it.Introduce the tube until the mark showed in the core pin to the correct assembly into the core pin before overmolding.If necessary, cut the parts to length, as per the approved product specification.Per qa procedure (breezeway ii guiding sheath shaft assembly) pull test (destructive test) using a tensile tester, a sheath hub holding fixture and/or clamp, perform the test to evaluate the bond strength between the sheath and hub as per procedure.Bond strength shall be [?] 15 n (3.37 lbf).For non-destructive testing, inspect first 5 good shots and last 5 shots of the lot.Remaining lot quantity to be inspected according to ansi z 1.4, gen level 1, normal, aql 0.65.Inspection for obstruction equipment: borescope, pin gauge (rounded) using a borescope, inspect the i.D.Of the sheath to ensure inner lumen is free of any obstructing material.· insert a rounded pin gauge of the appropriate french size and length into the proximal end of the shaft and through the distal tip to ensure correct fit and no obstructions.Ifu is packaged with this product.Returned device analysis revealed the hub became detached from the sheath which possibly indicates an overmolding issue.In conclusion, the review of the dhr did not identify any manufacturing anomalies of this type and passed all final testing prior to shipment.The failure of the returned product was confirmed by our investigation.Integer is submitting the above report to comply with 21 cfr part 803, the medical device reporting regulation.The report is based upon information obtained by integer which the company may not have been able to investigate or verify prior to the date the report was required by fda.This report does not constitute an admission that the device, integer, or its employees, caused or contributed to the event described in this report.Nor does this report reflect a conclusion by fda, integer, or its employees, that the report constitutes an admission that the device, integer, or its employees caused or contributed to the event described in this report.
|