Additional information: d9, h3, h4, h6 and h11.H11: two devices were received for evaluation.Visual inspection did not identify any abnormalities that could have contributed to the reported condition.The sets underwent functional testing by installing the valve set sample on a compounder and performing the system functional test procedure for the main module compounding system.This included the setup wizard which further included prime, verify, automated occlusion self-test, pump calibration, and direct entry compounding cycles with a 70% dextrose solution set to port 19 and sterile water universal ingredient to port 24 for testing.No calibration errors or leaks were encountered during testing.The reported condition was not verified in either sample.A batch review was conducted and there were no deviations found related to this reported condition during the manufacture of this lot.Should additional relevant information become available, a supplemental report will be submitted.
|