|
Company was notified of a revision surgery.An investigation was performed including internal analysis of records and surgeon's feedback.Surgeon reported radiographs and examination 3 days following implantation showed good bone alignment.Patient placed in a splint and allowed for removal of splint for hygiene and gentle rom.At day 8 patient reported an immediate pain following light activity.Surgeon's examination revealed implant was broken at the fracture site.Patient non-compliance with post-operative regime was suspected but was not confirmed by the patient.The device could not be examined as it was not provided to the company.No imaging was provided.A revision surgery was performed with a metal screw following removal of the broken implant by drilling through.A bacterial infection developed at the site following the revision procedure, which required additional medical intervention.There is no indication of a design, manufacturing or process issue affecting implant safety or effectiveness.The company is unable to identify a definitive root cause though it is likely related to unintentional non-compliance with post-operative care regime, applying excessive force to the surgical site.Because the company cannot rule out the possible contribution of the device to the event, out of an abundance of caution, this event is being reported.Company continues to monitor these events as part of post market activities.Additional report from the manufacturer relating to this event is: #3014554088-2025-00004.
|