| Model Number |
1974.09.040 |
| Medical Device Problem Code |
Unstable (1667)
|
| Health Effect - Clinical Code |
Joint Laxity (4526)
|
| Date of Event |
09/18/2025
|
|
Type of Reportable Event
|
Serious Injury
|
|
Event or Problem Description
|
|
Shoulder revision surgery due to instability performed on (b)(6) 2025.Previous surgery took place on (b)(6) 2025.The following components were removed: smr reverse liner +6mm d.40mm (part code: 1365.50.820, lot number: 22at16b, sterilization: 2200271).Prima glenosphere d.40 mm (part code: 1974.09.040, lot number: 2433271, sterilization: 2500004).Connector w.Screw low lat.5mm (part code: 1974.15.300, lot number: 2320196, sterilization: 2400132).According to the information received, the initial surgery was performed on (b)(6) 2025, for a fracture.The second revision on (b)(6) 2025, was a planned revision to finish the intended corrections from the first implant.The surgery on (b)(6) 2025 was due to the patient dislocation because the previous revision did not fully stabilize the joint.The patient is a male, date of birth on (b)(6) 1945.The event happened in the united states.
|
| |
|
Additional Manufacturer Narrative
|
|
Checking the manufacturing and sterilization charts of the components involved in this event, no pre-existing anomaly, that could have contributed to the event, was discovered in the items belonging to the same part codes and lot numbers as the devices removed in the revision surgery hereby reported.The manufacturer will submit a final mdr as soon as the investigation is complete.
|
| |
|
Event or Problem Description
|
|
Shoulder revision surgery due to instability performed on (b)(6), 2025.Previous surgery took place on (b)(6), 2025.The following components were removed:
- smr reverse liner +6mm d.40mm (part code 1365.50.820, lot number 22at16b, sterilization 2200271)
- prima glenosphere d.40 mm (part code 1974.09.040, lot number 2433271, sterilization 2500004)
- connector w.Screw low lat.5mm (part code 1974.15.300, lot number 2320196, sterilization 2400132)
according to the information received, the initial surgery was performed on (b)(6), 2025, for a fracture.The first revision on (b)(6), 2025, was a planned revision to finish the intended corrections from the first implant.The surgery on (b)(6),2025 was due to the patient dislocation because the previous revision did not fully stabilize the joint.The patient is a male, date of birth (b)(6), 1945.The event happened in the united states.
|
| |
|
Additional Manufacturer Narrative
|
|
Checking the manufacturing and sterilization charts of the components involved in this event, no pre-existing anomaly, that could have contributed to the event, was discovered in the items belonging to the same part codes and lot numbers as the devices removed in the revision surgery hereby reported.From follow-up communication with complaint source no further information regarding the case have been retrieved.Explanted components have been discarded, therefore they are not available for analysis.No x-rays nor pictures of explanted components were provided either.Hence, taking into account that:
- dhrs review did not highlight any anomaly on involved lot;
- no further events have been reported for involved lots;
- explanted components have been discarded and x-rays or pictures have not been provided, therefore no more in-depth investigation can be performed;
the manufacturer has no evidence to consider the event as product related.According to the available pms data, the revision rate of prima glenosphere, belonging to the family product codes 1974.09.Xxx and 1976.09.Xxx due to instability is around 0.04%.Based on the investigation performed, no corrective action is required for this specific case.The manufacturer will continue monitoring the market to promptly detect any further similar issue.
|
| |
|
Search Alerts/Recalls
|
|