1.Incident description: during balloon dilation of esophageal stricture, a 15-18 mm catheter was used.At 18 mm, the balloon catheter ruptured inside the patient and could not be reinflated.2.External investigation: the customer provide the photo of defective product.3.Analysis of the complaint phenomenon: however, due to insufficient information provided by the customer, we are unable to further analyze and judge.Combined with the history of customer complaints, we investigated raw materials, investigated from production processes, packaging and transportation, investigation and analysis as follows.3.1 raw materials: based on complaint batch information m241104208, the corresponding raw material incoming inspection records were reviewed.All components underwent incoming appearance, dimensional, and performance testing.After passing the tests, they were accepted into inventory with no abnormalities detected.3.2 production process: based on the balloon product production flowchart analysis, processes associated with balloon rupture include balloon inflation, balloon welding, and related inspection procedures.Balloon blowing inspection (appearance): in the process of balloon blowing, after the balloon was blown into shape, we checked the appearance of the formed balloon, so the possibility of leaking and flowing out was very low.The balloon blowing inspection: after the balloon body was blown, the wall thickness, fatigue performance and maximum pressure were sampling checked in the first inspection, process inspection and finished inspection.To ensure that the balloon body meet the performance requirements before welding.Process inspection: after balloon welding, 100% inspection is conducted on appearance and rated pressure to verify balloon-catheter seal integrity, minimizing the risk of defective products entering the market.Finally inspection: 100% negative pressure inspection was done after balloon body was folded to check the leak proofness of the whole balloon.So, the risk of nonconforming products outflow was very low.Analysis: the production process has gone through many tests of the rated pressure and the burst pressure, so the probability of defective outflow is extremely low.3.3 packaging and transportation: balloon packaging investigation: the balloon got effectively protected during the packaging process.The balloon was put into capture tube, and then was put into the inner bag and got sealed.This process will not damage the balloon.Then the sealed inner bag was put into a middle box and finally got packed into an outer box according to the packaging requirements.This process will not damage the balloon.After investigating raw materials, production processes, packaging, and transportation, no fundamental cause for balloon rupture during manufacturing was identified.Based on customer complaint feedback and image analysis, we hypothesize that balloon rupture may stem from the following potential causes: the balloon cannot withstand the pressure and bursting.Sharp functional corners of mating instruments (e.G., sharp edges of anastomotic staples or stents, etc.) scratch or poke the balloon.To determine whether the balloon ruptured due to inability to withstand pressure, we selected two balloons from the same batch of simulated testing.Each balloon was inflated to the third usage pressure, maintained for 30 seconds, then depressurized.This cycle was repeated at least 20 times.No balloon rupture or damage occurred in any test.Conclusion: after investigating structural design, raw materials, inspection methods, and storage/transportation, the root cause of the balloon bursting could not be identified.Following an internal investigation, we conducted simulated tests on balloons from the same batch and found no performance abnormalities.We will continue to monitor this issue.
|