Additional information was added to d9, h3, h6 and h11.H11: one sample was received for evaluation; the other sample was not received and therefore, could not be evaluated.A visual inspection was performed and a missing drain line cap was observed.Leak, clear passage, and clamp function tests were performed, and no issues were observed.The reported condition was verified.The cause of the condition could not be determined.A batch review was conducted and there were no deviations found related to this condition during the manufacture of this lot.Should additional relevant information become available, a supplemental report will be submitted.
|