|
Additional initial reporter name is (b)(6).Fields d1, d4 of the emdr is for original iabp cs100; however this iabp was upgraded to a cs300 intra-aortic balloon pump.Updated fields: b4,d8, d9, g3, g6, h2,h3, h6(investigation findings, type of investigation, investigation conclusions), h11 , e3 , e1 ( event site address , initial reporter , event site email , event site telephone ).A getinge field service engineer (fse) was dispatched to evaluate the unit.Fse was not able to reproduce the issue the customer experienced.Fse removed and replaced the batteries (d146-00-0039) as a preventative measure as the customer stated that battery issues have been a problem for them.Verified the units battery fully charged.Unit passed all functional and safety tests per factory specifications.Unit returned to customer and cleared for clinical use.Corrected field : b1.
|