Additional information: d9, h3, h4, h6 and h11.H11: the device was received for evaluation.During visual inspection improper assembly was observed between the drip chamber and the tubing.Pressure and clear passage testing were performed, and a leak was noted between the drip chamber and the tubing.Priming with sterile water also showed a leak between the drip chamber and the tubing.The reported condition was verified.The cause of the condition was due to the manufacturing process.All product lots must pass acceptable quality levels (aql) and final testing prior to release.Additional controls are in place including test methods for in-process and final release testing, validation of manufacturing processes, and procedures for proper assembly, packaging, and handling of products to ensure products meet specifications prior to distribution.A batch review was conducted and there were no deviations found related to this reported condition during the manufacture of this lot.Should additional relevant information become available, a supplemental report will be submitted.
|