Additional information: d9, h3, h4, h6: component codes(additional code), h6(update codes), h11.H11: two devices were received for evaluation.Visual inspection on the returned samples did not identify any abnormalities that could have contributed to the reported condition.Pressure test and clear passage test were performed and a leak between the tube and the second connection of tube (bushing) was observed in one of the devices.The other sample was tested under water and the results were satisfactory, with no defects observed.The reported condition was verified in one device; however, it was not verified in the other returned device.The cause of the issue was due to an incorrect manual assembly during manufacturing.A batch review was conducted and there were no deviations found related to this reported condition during the manufacture of this lot.Should additional relevant information become available, a supplemental report will be submitted.
|