|
B3: date of event is estimated.The unit was returned for evaluation on 31-mar-2026.The unit was returned with a system error complaint, which was confirmed during testing.The fan was misaligned and contacting the accumulator likely due to high-impact incident, possibly from the unit being dropped.Also, high pressure caused by the muffler being filled with dust, which resulted in a blockage in the feed port and low sieve life (294), low internal (86.6%}, low external (87.9%).Furthermore, the psa cycle being high (14) is an indication that the zeolite is getting contaminated by moisture.Uip & lower housing were also replaced due to cosmetic damage.
|