|
Additional information: e3, h6, h11.H11: based on evaluation of the reported particulate matter (pm) complaint, this event is determined to conform to a previously identified and well-characterized issue.An investigation has already been performed.The investigation concluded multiple failure modes related to multiple root causes associated with process/procedural controls, materials, environment, and machine/tooling during manufacturing.Should additional relevant information become available, a supplemental report will be submitted.
|