|
Initial report ref to natus complaint# (b)(4) per (b)(4) rev 14 risk analysis spreadsheet - eds 3 external drainage system hazard 5.12 - stopcocks: broken, cracked, or fractured luer fitting and/or hub effect (harm): delay in patient treatment, csf leakage and over drainage of csf residual risk: medium.Stopcock breakage may result in fluid leakage and require device replacement.Implemented risk controls mitigate potential harm, and the clinical benefits of eds 3 in safe and accurate csf drainage continue to outweigh the residual risk.Related to capa005781.Further investigation to be carried out.
|