|
Additional information was added to d9, h3, h6, and h11.H11: the device and a video of the sample were received for evaluation.A visual inspection was performed to the actual sample received, and all components were correctly placed and according to the specification.No visual defects were observed in this unit.The sample was then submitted to pressure testing, and a leak was not observed.In addition, the sample was submitted to clear passage testing, and no blockage was detected.The returned video was reviewed, and it was noted that there was a leak from the filter vent hole.The reported condition was verified in the video sample.The cause of the reported condition could not be determined.Should additional relevant information become available, a supplemental report will be submitted.
|