|
It was reported that the procedure cancelled occurred.It was reported that a farastar generator was selected.During procedure, an error 301 was displayed when it was attempted to deliver pulse field ablation (pfa).No mapping system module (msm) was being used.Troubleshooting was performed, it was attempted to restart the device, change catheter and catheter cable, but the issue persisted.The procedure was not completed due to this issue.There was no patient complication reported.A field service engineer arrived on site, and the reported issue was confirmed.The unit was powered off and disassembled and removed faulty high voltage (hv) master board and installed new one in accordance.The unit was powered on and input new calibration measurements.Functional checks were performed and the unit passed all checks, and it was confirmed that is ready for clinical use.Product return is expected.
|